3.2.7 Rising Mains

This section details the rising sewer mains used in the collection network and recycled water distribution.

Zone 3 — SSP3 to Unit 40 Access Pit (Under Lake)

Item Detail
Pipe 40 mm lilac poly pipe encased in a 100 mm PVC pipe (upgraded from original DN32 HDPE Blueline)
Route Submerged sewer rising main under Lake Bennett from SPS3 (SSP3) to the access pit near Unit 40 (MH A / Access Chamber 2)
Onward From MH A via Zone 1 DN150 gravity main to SPS1 (SSP1), then WWTP Primary Tank 1 (PT-1)
Test Pressure tested successfully (original pipe)

Recycled Water Irrigation Mains

Treated Class A effluent is distributed from the WWTP discharge tank through the control room (microfiltration, UV, chlorine dosing) to the Land Application Areas via lilac-coloured subsurface dripline irrigation pipework.

Main Detail
Pipe colour Lilac (permanently coloured, per recycled water standards)
Technology Netafim Bioline 17 pressure-compensating dripline
Areas served Irrigation Area 1 (1,386 m²) and Irrigation Area 2 (6,234 m²)
Supplier Thinkwater NT

See 3.2.8 Effluent Disposal for irrigation area details.

Decommissioned Mains

Legacy System Decommissioned

The following rising mains from the pre-upgrade system have been decommissioned:

  • SSP1 to legacy LAA distribution box: 50 mm uPVC pressure pipe (previously exposed at ground level along access track)
  • SSP2 to SSP1 causeway crossing: 50 mm PVC pipe through riser chamber sidewall (replaced by STEP tank discharging to WWTP)
Version Control
Version Date Description
1.0 2025-10-06 Initial Release
2.0 2026-06-22 Updated for WWTP upgrade; marked legacy mains decommissioned
2.0.1 2026-06-22 Corrected irrigation area sizes per site
2.1 2026-10-30 Under-lake SSP3→SPS1 lilac poly corrected to 40 mm
2.2 2026-10-30 Under-lake route corrected: lands at Unit 40 access pit (MH A), then gravity to SSP1

Next Review Date: 2027-04-30