3.2.8.1 LAA A Construction 2025
Photo record of building Absorption Bed A (Irrigation Area 1 / LAA A) in late October 2025, as part of the AdvanTex WWTP upgrade. Lilac dripline was laid on the prepared bed (around retained trees), then covered and graded.
For current LAA A operation, valve box, and design drawings, see 3.2.8 Effluent Disposal. Plant and RWS construction photos from the same programme are on 3.2.10.1 WWTP Construction 2025.
Dripline Installation




Cover and Grading

Version Control
| Version | Date | Description |
|---|---|---|
| 1.0 | 2026-10-30 | Split from 3.2.8 — LAA A construction photos Oct 2025 |
Next Review Date: 2027-04-30